|
A TOTAL of HK$200 million will be spent dredging the
Shenzhen River between Luohu Checkpoint and Wenjindu
Checkpoint.The work is the subject of an agreement signed
between the Shenzhen and Hong Kong sides yesterday.The project
is the second section of the third phase of the Shenzhen River
treatment which is designed to improve the water quality and
river flow.Work on the 1.8 km-long river section will start
July 26 and be finished in 30 months. (Mu Zi)
|